Case Study 1: Pacific Highway – Oxley Highway to Kundabung

The Pacific Highway – Oxley Highway to Kundabung upgrade presented a variety of potential issues during the revegetation of the site.

Valley Hydramulch & Revegetation was required to develop a solution to failing standard applications on site. A solution was developed, tailored to the site soil conditions. This application would provide successful growth on site soils even in heavy rain and with poor surface preparation.

P2N

Case Study 2: Inland Rail – Parkes to Narromine

The Inland Rail – Parkes to Narromine (P2N) project presented the problem of large- scale open areas, requiring fast applications and effective germination in poor quality topsoil along some 103km’s of rail corridor.